
VIDEO: Woodside Reports 5,000-Tonne Module Installation on Tlaloc FPU
Modules weighing around 5,000 tonnes each have been installed on the 45,000-tonne Tlaloc FPU under construction in South Korea for the Trion project.

Modules weighing around 5,000 tonnes each have been installed on the 45,000-tonne Tlaloc FPU under construction in South Korea for the Trion project.

Sarens has lifted a 150-tonne Bospoort Bridge deck over the Brussels Charleroi Canal in Halle, Belgium, after barge transport to the site.

Belgian heavy-lifting specialist Sarens has swiftly executed the load-out of five major modules for FPSO P-79 at Brazil’s EBR Shipyard, showcasing exceptional mobilisation and engineering efficiency.
For general inquiries and to contact us,
please email: info@hmt-news.com