Search
Close this search box

Man injured after ship hits crane at Port of Tyne

A man was taken to hospital after a reported collision between a ship and a dockside crane at the Port of Tyne in South Shields. Police continued investigating the incident.
Image credit: Thomas Ord

SHARE ARTICLE

A man was taken to hospital after a reported collision between a ship and a dockside crane at the Port of Tyne in South Shields on 19 July 2026.

Northumbria Police received the report shortly after 13:00. The circumstances that led to the contact had not been determined, and officers continued their inquiries.

Emergency crews found a man with injuries at the port. He was transported to the Royal Victoria Infirmary in Newcastle. Police said his condition was not considered life-threatening.

Images from the scene showed the crane on its side and leaning against part of a container vessel. Eyewitness material identified the vessel as BG Orange, although police did not name the ship in their statement.

The North East Ambulance Service said it received the call at 13:02. Its response included three double-crewed ambulances, two clinical team leaders, a duty officer and three Hazardous Area Response Team vehicles. The Great North Air Ambulance Service also provided support.

One HART vehicle remained at the site to assist Tyne and Wear Fire and Rescue Service.

A drone operator who arrived after the incident said several containers aboard BG Orange appeared to have shifted from their positions.

The injured man remained in hospital while police examined how the incident occurred.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Lloyd’s Register, Maersk, Felixstowe and Charleston will assess operational, security and safeguarding requirements for nuclear-powered containerships under the Pink Corridor project.
The Panama Canal Authority has delayed a planned Neopanamax draft reduction, keeping the 14.63 m limit as it monitors Gatun Lake levels and expected El Niño-related drought conditions.
Maersk has selected Anemoi to install a 35 m Rotor Sail on an 8,700 TEU Maersk Lima-class container vessel, with the system scheduled to be fitted in mid-2027.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com