Search
Close this search box

Bernhard Schulte Offshore Adds Windea Clarke CSOV from Ulstein Verft

Bernhard Schulte Offshore has taken delivery of the CSOV Windea Clarke from Ulstein Verft, adding a hybrid battery propulsion vessel to its offshore wind fleet.
Bernhard Schulte Offshore Windea Clarke CSOV delivered by Ulstein Verft
Windea Clarke delivered from Ulstein Verft (Image source: ULSTEIN)

SHARE ARTICLE

Bernhard Schulte Offshore has taken delivery of the commissioning service operation vessel Windea Clarke from Ulstein Verft, adding another vessel to its offshore wind service fleet.

The vessel was delivered on 2 July 2026. It is the fourth CSOV delivered by Ulstein Verft to Bernhard Schulte Offshore within the past year, and the seventh offshore wind service vessel of Ulstein design in the company’s fleet.

Windea Clarke will support offshore energy projects during construction, commissioning and operations and maintenance (O&M). The vessel is fitted with Ulstein’s TWIN X-STERN® solution, hybrid battery propulsion and a design prepared for future methanol fuel.

The vessel has 111 cabins for up to 132 people, including up to 90 window cabins for offshore personnel. Its offshore access system includes a height-adjustable walk-to-work gangway and an integrated elevator tower for personnel and cargo transfers.

The CSOV is also equipped with a helideck for helicopters up to 8.6 tonnes, a 3D motion-compensated crane with a lifting capacity of up to 5 tonnes, storage areas and a height-adjustable boat landing system.

During sea trials, Windea Clarke achieved the voluntary DNV SILENT-E class notation for reduced environmental noise emissions.

The vessel is named after American electrical engineer Edith Clarke. Other vessels in the series are Windea Curie, Windea Clausius and Windea Carnot.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
DEME will deploy its jack-up vessel Norse Energi to transport and install 69 turbines in the Dutch North Sea, following an earlier foundation installation award. Preparations are scheduled to begin in 2028.
The EIB loan will support up to 25 second-generation survey vessels, remote sensing and underwater robotics, while a separate agreement extends €500 million in existing debt facilities to December 2031.
CBED has taken delivery of the vessel, which will be renamed Wind Dedication and chartered back to Seaway7 for existing projects until early 2028, with a full repaint planned at its next drydock.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com