Search
Close this search box

SAL Adds MV Alma to Deck Carrier Fleet

SAL has added MV Alma to its fleet, strengthening its deck carrier capability and expanding its ability to handle offshore transport and floating cargo worldwide.
Photo source: SAL

SHARE ARTICLE

SAL has added MV Alma to its fleet, expanding its presence in the specialised deck carrier segment.

The vessel, formerly named Sun Rise, was acquired as a heavy transport vessel. According to the company, the addition strengthens SAL’s capability in the deck carrier segment and expands its ability to handle complex offshore transports and floating cargo worldwide.

With semi-submersible capability and large deck space, MV Alma is suited for large-scale offshore and heavy transport projects. The vessel also broadens the range of solutions SAL can offer clients across the global market.

Built in China in 2012, MV Alma has a deadweight of 24,629 tonnes and a deck size of 134 m by 44 m. The vessel has semi-submersible capability for floating cargo transport, a maximum submerged deck draught of 7.5 m, and uniform deck strength of 20 t/m². Average service speed is 9.5 knots, and the vessel is fully equipped for worldwide operations.

𝗞𝗲𝘆 𝗳𝗲𝗮𝘁𝘂𝗿𝗲𝘀:
– Built in China, 2012
– Deadweight: 24,629 t
– Deck size: 134 x 44 m
– Semi-submersible capability for floating cargo transport
– Maximum submerged deck draught: 7.5 m
– Uniform deck strength: 20 t/m²
– Average service speed: 9.5 knots
– Fully equipped for worldwide operations

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Fanzhou 7 set a new record by carrying 132 EN156 wind turbine blades on its maiden voyage from Qidong to India, underlining the scale of specialised wind energy transport.
Jumbo Marine completes discharge of a 1,122 tonnes stinger in Genoa after transport from Karimun onboard MV Fairmaster, supported by detailed 3D engineering planning and safety-led execution.
The Pont Anne de Bretagne bridge deck is sheltering in Lorient as high Loire river flow delays the final tow to Nantes, following re-float operations completed on 25 February.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com