Search
Close this search box

DEME Wins 25-Year Port Access Channel Concession in Brazil’s Paranaguá

DEME and FTS have secured a 25-year concession to operate, maintain, and expand the access channel to Brazil’s Port of Paranaguá, increasing draft depth to 15.5 m.
Image source: DEME

SHARE ARTICLE

Belgian marine infrastructure group DEME has won Brazil’s port access channel concession, securing a 25-year contract to operate, maintain, and expand the marine access channel to the Port of Paranaguá, the country’s second-largest public port in the southern state of Paraná.

The concession was awarded to the Canal Galheta Dredging Consortium (CCGD) — a partnership between DEME and FTS Participações Societárias S.A. (FTS) — following a competitive tender launched by Brazil’s National Waterway Transportation Agency (ANTAQ). The initiative forms part of Brazil’s broader strategy to modernize and enhance key port infrastructure.

Recognized as a critical logistics hub, the Port of Paranaguá handles major agribulk, container, and liquid bulk volumes, serving as one of South America’s leading export gateways. Under the new concession, CCGD will be responsible for maintaining, operating, and deepening the access channel, increasing the port’s permissible draft of 13.3 meters to 15.5 meters.

In addition to dredging, the consortium will manage nautical signaling and the port’s beacon system, ensuring safe and continuous navigation. The deepening works will enable larger vessels to access Paranaguá, boosting cargo capacity and operational efficiency.

The next steps will involve the completion of administrative procedures before the formal signing of the concession agreement. FTS, DEME’s partner, is an experienced port terminal and logistics operator active in Paranaguá and other Brazilian ports.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Partner Stocznia has contracted Vuyk Engineering to design a 3,000 m³ TSHD intended for maintenance work and support duties on dredging projects.
RWE has installed 22 of 44 Vestas turbines at the 660 MW Nordseecluster A offshore wind farm, with full grid connection scheduled for the beginning of 2027.
Boskalis is using Medway for maintenance dredging on Germany’s 90-km Weser River, removing sand and silt to maintain access to Bremen and Bremerhaven for large container ships.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com