
Seadrill Wins New Work for West Capella and West Elara
Seadrill awarded new contracts for West Capella in Malaysia and West Elara with Equinor AS in Norway, while extending West Carina through April 2026.

Seadrill awarded new contracts for West Capella in Malaysia and West Elara with Equinor AS in Norway, while extending West Carina through April 2026.

Lime Petroleum has completed a three-well drilling campaign on the Brage platform, including the Talisker producer and exploration well, while the operator of Bestla (PL740) has finished a multi-well programme with the Deepsea Yantai rig, adding commercial oil in Cook, Statfjord and Brent Group formations.

Valeura Energy has finished a nine-well campaign on Block B5/27 in the Gulf of Thailand and plans a 16-well 2026 program across its Thai fields, supported by a rig and Wassana redevelopment work.

Dixstone’s new HARIMA modular drilling rig has started its first well from the Emeraude AA platform offshore the Republic of Congo, following completion of endurance testing and connection to the field power grid.

Petrobras has halted drilling at the Morpho well in the Foz do Amazonas Basin after 15 m³ (15,000 litres) of synthetic-based drilling mud leaked from auxiliary lines on the offshore rig.

Petrobras has paused Morpho well drilling after losing about 15 m³ of synthetic fluid, as Ibama classifies the offshore event as low severity with no environmental risk.

Borr Drilling confirms new jack-up work: Ran extends in Mexico for a 75-day ENI well, while Odin secures a US two-well programme with an optional third, starting mid-2026.

Transocean secures new Brazil and Norway work for Deepwater Mykonos and Transocean Enabler, lifting firm backlog by about $168 million through contracts with BP, Equinor and Petrobras.

ASRY completed rig repair and upgrade works for ADES Holding in 2025, preparing ADM-501/ADM-504 for Nigeria and completing ADM-503/ADM-511 for Thailand and Brazil.
For general inquiries and to contact us,
please email: info@hmt-news.com