
Adura wins approval to produce gas from Jackdaw
Jackdaw’s four-well platform connects to Shearwater through a subsea pipeline. Its jacket, topsides and pipeline are installed, and drilling was completed in early 2026, according to Adura.

Jackdaw’s four-well platform connects to Shearwater through a subsea pipeline. Its jacket, topsides and pipeline are installed, and drilling was completed in early 2026, according to Adura.

Bower Offshore has acquired the 2010-built PSV Songa Commander and renamed it Bower Commander. The vessel is contracted to Adura for drilling support until July 2027.

Rosebank’s public consultation period was scheduled to run until 17 August 2026 as Adura’s offshore development continues through the UK consent process.
For general inquiries and to contact us,
please email: info@hmt-news.com