A Seoul court has ordered KOGAS to pay KRW299.6bn to Samsung Heavy Industries after defective LNG cargo tanks on SK Serenity and SK Spica led to costly repairs and claims by SK Shipping.
Photo: Samsung Heavy Industries

SHARE ARTICLE

A court in Seoul has ruled that natural gas company Korea Gas Corporation (KOGAS) must pay damages to shipbuilder Samsung Heavy Industries (SHI) for losses tied to defective LNG cargo tanks installed on two gas carriers.

In its recent judgment, the South Korean court found KOGAS largely responsible for the losses suffered by SHI. The court ordered the gas company to pay KRW299.6 billion to SHI, covering losses arising from LNG cargo tanks that were later found to have design defects.

The dispute stems from arbitration proceedings before the London Maritime Arbitrators Association (LMAA), where SK Shipping brought a claim against SHI. SK Shipping argued that problems with the cargo tanks caused delays, financial losses and depreciation of the vessels. The LMAA tribunal ordered SHI to pay nearly KRW400 billion in damages to SK Shipping, as well as additional settlement-related costs.

Following the arbitration award, SHI filed a lawsuit in South Korea against KOGAS to recover the sums it had been ordered to pay. Earlier this month, the Seoul court accepted SHI’s position that KOGAS was responsible for the design of the tanks at issue. At the same time, the court held that SHI also bore part of the responsibility and therefore limited KOGAS’s share of the compensation to KRW299.6 billion.

The LNG cargo tanks at the centre of the dispute were developed by KOGAS and installed on the LNG carriers SK Serenity and SK Spica. Both vessels were built by SHI and delivered to SK Shipping in the first quarter of 2018.

Defects in the cargo tanks were discovered only after delivery. SK Shipping later reported gas leaks and cracks, which required SK Serenity and SK Spica to return to the shipyard on four separate occasions for repairs. The repair work generated additional costs of more than KRW100 billion.

Because of this repeated repair cycle, neither SK Serenity nor SK Spica completed a single commercial voyage. Operations were suspended, and the two LNG carriers have remained idle for around six years.

With this ruling, the court has confirmed that KOGAS must bear most of the financial impact arising from the cargo tank design, while also recognising that SHI retains a degree of responsibility for the project. The damages award compensates the shipyard for losses linked to the installation of the defective LNG cargo tanks.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
GTT has received an order from Samsung Heavy Industries for the tank design of one 180,000 m³ LNG carrier for a European shipowner, with delivery expected in 2028.
Ocean Yield and NYK have made effective an eight-ship 200,000 cbm LNG carrier programme at HD Hyundai Heavy Industries, valued at about $2.08 billion, with delivery expected by 2029.
Technip Energies, with JGC and Samsung Heavy Industries, wins an MRV contract to advance Coral Norte FLNG offshore Mozambique, following early works and a hull launch in Geoje.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com