Search
Close this search box

HAREKET Moves 601 tonnes CO₂ Stripper to Habshan 5

HAREKET transported a 601 tonnes CO2 Stripper and four CO2 Absorbers about 130 km in Abu Dhabi for the PE 109 CRI Project – Habshan 5, using SPMTs and hydraulic trailers.
Photo source: HAREKET via LinkedIn

SHARE ARTICLE

HAREKET has safely transported one CO₂ Stripper and four CO₂ Absorbers for the PE 109 CRI Project – Habshan 5 in Abu Dhabi, UAE. The cargo moved from the ICAD private jetty to the Habshan 5 site over a distance of approximately 130 km.

The CO₂ Stripper measures 50.7 m in length, 10.5 m in width, and 10.6 m in height, weighing 601 tonnes (t). The transport operation used 64 axle lines of TII SCHEUERLE SPMTs and 60 axle lines of hydraulic trailers. During the move, the convoy travelled via the E11 highway and crossed the Etihad Rail line in the Tarif area under controlled conditions.

Photo source: HAREKET via LinkedIn

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Three power generation components weighing up to 335 tonnes were transported to Ireland, with Terra Marique using specially engineered ramps and SPMTs to discharge cargo at a tidal beach landing site.
BOA’s scope covered engineering, marine operations and equipment, with Sarens supplying SPMTs. Wicher was the first of three contracted launches; BOA’s August plan put the next two within two years.
Sarens has completed the load-out of floating dock sections weighing approximately 4,000 t each at Szczecin Shipyard in Poland, using 168 SPMT axle lines and six KAMAG K24ST power pack units.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com