Search
Close this search box

Bencros Cuts Tug Fender Downtime for Boluda

Bencros delivered rapid, custom-fit fender replacements for three Boluda Towage Rotterdam ASD tugs using on-site measurement, 3D scanning and recycling, reducing downtime and eliminating installation risks.
Image courtesy of Bencros

SHARE ARTICLE

Boluda Towage Rotterdam has upgraded the fender systems on three ASD tugboats using a rapid on-site replacement service developed by Bencros.

The project addressed a common fleet maintenance issue: missing or outdated vessel drawings. Without reliable drawings, replacement fenders can fail to fit correctly, creating the risk of re-welding mounting systems, structural adjustments, higher costs and extended downtime.

Bencros measured the fender mounting arrangements directly on board during drydock. For one tug, measurements were carried out manually by specialist fender engineer Jakub Bartoň. A second workboat, which had not originally been designed for proper marine fenders, required 3D scanning to create an accurate digital model and CAD drawing for a suitable fender configuration.

The third tug required a long replacement fender that could not be transported by a standard truck. Bencros proposed a three-part fender system that could be joined seamlessly, reducing transport complexity while maintaining full functionality.

Following the measurements, Bencros produced the fenders in three days and delivered the custom-fit fenders within a further four days from its factory in Bošany, Slovakia. The approach avoided modifications to the vessel mounting structures and helped reduce operational downtime.

The project also included a circular element. Old fenders were removed, returned and recycled, with recovered rubber reused in Bencros production.

Boluda Towage Rotterdam said the service helped avoid the risk of ordering replacement systems that would later require new mounting structures. The company also noted that the recycling element supported Boluda’s Net Zero Target.

For Bencros, the project marks a shift from standard fender supply toward a service-driven model based on on-site assessment, tailored engineering, fast production and material reuse.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Pakistan 1,100 TEU containership under assembly at Karachi Shipyard & Engineering Works
Pakistan has begun assembling a 1,100 TEU containership at Karachi Shipyard, its first large commercial shipbuilding project in more than 40 years.
A port services operative died after becoming entangled in ropes connected to a ferry’s mooring lines during operations at Cairnryan Harbour in Scotland.
Tug Network Team appoints Felipe Gouvêa as Executive Director to strengthen coordination, governance and service standards across 113 ports in 13 countries.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com