Search
Close this search box

Bałtyk 3 Topside Moves to Yard at Vlissingen

Bałtyk 3 offshore substation topside has been moved from the production hall to the yard at Smulders’ Vlissingen site, where outfitting and transformer installation will continue ahead of next year’s load-out.
Image source: Smulders

SHARE ARTICLE

The Bałtyk 3 offshore substation topside has been successfully moved out from the production hall to the yard at Smulders’ site in Vlissingen, following the move-out of the Bałtyk 2 topside earlier this year.

The topsides will now undergo further works outside the production hall. The next activities include additional outfitting and transformer installation ahead of the planned load-out next year.

At the same time, jacket fabrication is continuing at Smulders’ yard in Newcastle.

The Bałtyk 2 and Bałtyk 3 offshore wind farms in the Polish Baltic Sea are being developed by Equinor and Polenergia. Each project is planned with an installed capacity of 720 MW, giving a combined total of 1,440 MW.

Smulders is responsible for the engineering, procurement, construction, testing and commissioning of the two offshore substations, including the topsides and jackets. The company is also manufacturing transition pieces for the wind farms together with Sif.

Bałtyk 2 and Bałtyk 3 show how Smulders’ engineering teams and yards work across borders, combining expertise to deliver complex offshore infrastructure safely, efficiently and reliably.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Smulders has loaded two offshore substation jackets for the Bałtyk 2 and Bałtyk 3 wind projects onto barges at its Newcastle yard for transport to the Polish Baltic Sea.
Vestas and EnBW are investigating a blade failure involving a V236-15 turbine at the 960MW He Dreiht offshore wind farm. No injuries occurred, and the site was secured.
BW Ideol and NGE will jointly develop the Fos3F concrete floating foundation factory at Fos-sur-Mer, targeting annual production of around 30 units for the Mediterranean market.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com