Search
Close this search box

BOA Launches Dock Sections at Wulkan Shipyard

BOA completed the launch of two 82 m x 47 m floating dock sections at Wulkan Shipyard using the semi-submersible barge Boabarge 36.
Image source: BOA

SHARE ARTICLE

BOA has completed the launch of two floating dock sections at Wulkan Shipyard for Trend Projekt.

Each section measures 82 m by 47 m. The launch was carried out using the semi-submersible barge Boabarge 36, which measures 124 m x 31.5 m x 7.93 m and provides 3,600 m² of deck space.

BOA said the barge’s submerging capacity of 8 m forward and 12 m aft above deck supported a safe and controlled float-off operation.

The third and final floating dock section is scheduled to be launched in August 2026.

Once completed, the floating dock will be one of the largest in the Baltic Sea and is expected to strengthen shipbuilding capacity in Western Pomerania.

BOA also provided engineering support and operational management for the barge during the project.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Sarens has completed the load-out of floating dock sections weighing approximately 4,000 t each at Szczecin Shipyard in Poland, using 168 SPMT axle lines and six KAMAG K24ST power pack units.
The UK will build three floating docks for the Royal Navy’s nuclear submarine fleet and a new Cefas research vessel at British shipyards under major domestic shipbuilding programmes.
BOA completed the Wicher frigate launch in Gdynia using BOABARGE 33 after the vessel was transferred from the construction hall to the semi-submersible barge by SPMTs.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com