Search
Close this search box

GTT Secures LNG Carrier Tank Design Order

GTT has received an order from Samsung Heavy Industries for the tank design of one 180,000 m³ LNG carrier for a European shipowner, with delivery expected in 2028.
Photo courtesy of GTT

SHARE ARTICLE

GTT has received an order from Samsung Heavy Industries for the tank design of one new LNG carrier. The order was recorded in the first quarter of 2026 and was placed on behalf of a European shipowner.

Under the contract, GTT will design the vessel’s cryogenic tanks with a total capacity of 180,000 m³. The tanks will be fitted with the Mark III Flex membrane containment system.

Delivery of the vessel is expected in 2028.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
K Line has named the 174,000-cbm LNG carrier TOHO EMERALD at Samsung Heavy Industries in South Korea, with delivery scheduled for October 2026.
Mitsui O.S.K. Lines will deploy two Wind Challenger sails on a 174,000 m³ LNG carrier, with annual fuel savings of 6-7% and up to 12% on an Atlantic voyage expected.
QatarEnergy-controlled LNG carrier Al Marrouna has crossed the Strait of Hormuz, marking the first visible exit of Qatari LNG through the waterway since July.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com