Search
Close this search box

Two STS Cranes Delivered to AGCT Rijeka

Two fully assembled 1,560-tonne STS cranes arrived at AGCT Rijeka after a 40-day, 11,000-nautical-mile voyage from Shanghai aboard the Zhen Hua 25, a 1988-built Hong Kong-flagged heavy load carrier.
Photo source: Liburnia Group via LinkedIn

SHARE ARTICLE

Two fully assembled ship-to-shore (STS) cranes, each weighing 1,560 tonnes, were successfully delivered to AGCT Rijeka following long-distance transport.

The delivery followed a 40-day voyage covering 11,000 nautical miles from Shanghai. The cranes arrived on board the Zhen Hua 25, and the shipment was completed without incident.

The Zhen Hua 25, a 1988-built heavy load carrier operated by ZPMC, is 37 years old and sails under the Hong Kong flag. The vessel transported the units to Croatia fully assembled for direct discharge at the terminal.

 

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
BOSKALIS heavy load carrier MIGHTY SERVANT 1 left the Port of IJmuiden on 7 December, heading for Bremerhaven/Nordenham in Germany with an ETA of 8 December at around 08:00 hrs.
The Heavy Load Carrier JUMBO JUBILEE made a bunkercall at Everingen before continuing toward Valencia, where AIS data confirms her arrival on 19 November.
The HLV Jumbo Jubilee is transporting 478-tonne Transition Pieces between Avilés and Rønne as part of a five-shipment program managed through the JSI Alliance. The voyage included a Rotterdam stop for 100% biofuel bunkering.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com