Search
Close this search box

Harbor Bridge Truss Removed in Corpus Christi

Mammoet removed the 2,300t truss of the US 181 Harbor Bridge in Corpus Christi for TxDOT and FlatironDragados. The structure was lowered 50 meters, loaded onto a barge, and moved using 108 axle lines of SPMT.
Photo source: Mammoet

SHARE ARTICLE

Mammoet completed the removal of the historic US 181 Harbor Bridge in Corpus Christi, Texas, performed as part of the Texas Department of Transportation’s Harbor Bridge Replacement Project for FlatironDragados.
The 2,300t truss was lowered 50 meters using strand jacks, placed on a barge, and transported to a nearby facility with 108 axle lines of SPMT.
With more than 60 years of service, the steel truss bridge reached its final stage of decommissioning as TxDOT advances the new cable-stayed Harbor Bridge.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Mammoet Italy completed the loadout of a 10,800t jacket at the Saipem yard in Arbatax using 300 SPMT axle lines.
Mammoet completed the 33,000 tonnes Scarborough topsides load out in China using its integrated Mega Jack lifting and weighing system to streamline heavy transport work.
Mammoet supported Allseas in the 2025 load-in of the Heather Alpha and Eider Alpha topsides, completing both floating operations in a single shift after integrated preparation of Iron Lady for the two structures.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com