Search
Close this search box

FPSO P-79 Departs South Korea for Búzios Field

FPSO P-79 has departed Geoje-Si for the Búzios field in the Santos Basin. Petrobras plans for the unit to arrive in February 2026 and begin production in August 2026, adding capacity to the field’s ongoing development.
Photo source: Petrobras

SHARE ARTICLE

The FPSO P-79 has departed Hanwha Ocean’s shipyard in Geoje, South Korea, beginning its tow to the Búzios field in Brazil’s Santos Basin, according to Petrobras. The vessel left the yard on 11 November, with its crew on board, a measure the operator said had also been used for FPSO P-78.

Petrobras states that the unit is scheduled to arrive at Búzios in February 2026 and begin production in August 2026. The FPSO is designed to produce 180,000 barrels of oil per day and compress 7.2 million m³ of gas per day. The development plan for P-79 includes 14 wells, consisting of eight producers and six water-alternating-gas (WAG) injectors.

The company explains that P-79 is the eighth of twelve units planned for the field. Petrobras also notes that P-78, the seventh unit, is expected to start operations in December, and that these additions will increase installed capacity at Búzios by about 15.6%, reaching approximately 1.3 million bpd.

Renata Baruzzi, Director of Engineering, Technology and Innovation, said the approach used for P-79 and P-78 has reduced the time required to begin production, and added that detailed planning, supplier negotiations, and internal efforts contributed to the ability to bring first oil forward by about two months relative to the current Strategic Plan.

The Búzios field lies in ultra-deep waters of up to 2,100 m, around 180 km off the coast of Rio de Janeiro. It currently hosts six FPSOs: P-74, P-75, P-76, P-77, Almirante Barroso, and Almirante Tamandaré. The Almirante Tamandaré, operating since February 2025, recorded an instantaneous production flow of 270,000 bpd on 25 October 2025.

The P-78 departed Seatrium’s Benoi shipyard in Singapore on 13 July, arriving at Búzios on 30 September. In the following month, the field surpassed 1 million bpd, making it Petrobras’ largest producing field.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
South Korea’s Justice Ministry plans visa changes to attract more skilled foreign technicians to shipbuilding as yards face labor shortages and Ulsan’s regional visa pilot remains under review.
Petrobras controls 36 of Brazil’s 49 offshore rigs, while Westwood Global Energy Group data point to 5,472 minimum rig days of demand through 2029.
Hanwha Ocean won a Chevron contract to build additional modules for the Leviathan expansion offshore Israel, supporting added wells, subsea work and higher gas deliveries, with start-up targeted toward decade-end.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com