
Petrobras P-82 FPSO Departs Singapore for Brazil’s Búzios Field
Petrobras’ P-82 FPSO departed Singapore for Brazil’s Búzios field on 18 October. The 225,000-bpd production unit is expected to begin operations in 2027 as the field’s tenth platform.

Petrobras’ P-82 FPSO departed Singapore for Brazil’s Búzios field on 18 October. The 225,000-bpd production unit is expected to begin operations in 2027 as the field’s tenth platform.

Petrobras’ P-80 FPSO has left Seatrium’s Singapore yard for Brazil, where the 225,000-bpd unit is expected to begin operations at the Búzios field in early 2027.

Karoon Energy has cut its 2026 Baúna production guidance after an SPS-92 electrical fault deferred about 3,500 bopd and prompted plans for another rig intervention.

MOL Group company SeaLoading has secured a long-term Petrobras contract to continue offshore crude oil transfer services in Brazil using SeaLoader 2.

bp has agreed terms for Shell to acquire stakes in the Tupinambá block offshore Brazil and the Conifer prospect in the deepwater US Gulf of Mexico, with bp remaining operator.

The Tupi asset in Brazil’s pre-salt Santos Basin has reached cumulative production of 4 billion boe, the first Petrobras asset to reach that volume in its 73-year history.

Baker Hughes has extended its Petrobras contract to expand integrated well construction work across Brazil’s pre-salt fields in the Santos Basin.

Seatrium says P-78 started producing on 31 December 2025, marking a full EPCC FPSO scope that includes at-sea commissioning, before Final Acceptance by Petrobras.

Petrobras starts production from the P-78 FPSO at Búzios, designed for 180,000 barrels/day and 7.2 million m³/day of gas.
For general inquiries and to contact us,
please email: info@hmt-news.com