Texas-based Tenaris has been awarded a key contract to supply casing, tubing, line pipe and coatings for the Trion field, located in the Perdido Fold Belt approximately 180 km off the Mexican coastline.
At a water depth of around 2,500 metres, Trion is a greenfield ultra-deepwater project operated by an affiliate of Woodside Energy (60 %) together with Pemex (40 %). Under the Rig Direct® service model, Tenaris will supply 12,000 tons of casing and tubing, including 1,600 tons in the Super 13 Chrome steel grade. For the line pipe portion, Tenaris will deliver approximately 16,000 tons of pipe for flowlines and risers, including coatings under the One Line® service model.
Commercial Vice-President for Tenaris Mexico, Pablo Gómez, said the Trion project “represents a historic milestone for Mexico’s energy future, and we are proud to be part of it”.