Search
Close this search box

VARD Completes Skandi Minder Upgrade

VARD has completed a major upgrade of DOF’s subsea vessel Skandi Minder, covering ROV/LARS improvements, engine overhaul and broader repair work at Vard Langsten.
Image source: VARD

SHARE ARTICLE

VARD has completed an extensive upgrade of DOF Group’s subsea vessel Skandi Minder, with the work aimed at strengthening the vessel’s capabilities and extending its service life.

The repair and conversion work was carried out at Vard Langsten. The scope included an upgrade of the remotely operated vehicle (ROV) and launch and recovery system (LARS), with installation of a new Ulmatec system and electrical integration.

The vessel’s main engine was overhauled by Wärtsilä with support from VARD. Full surface treatment was also completed, followed by repainting in DOF Group’s colours. Additional repair and maintenance work covered interior areas, piping and electrical systems, including further upgrades identified during the yard stay.

According to VARD, one of the main challenges was delivering a complex and multidisciplinary scope within 8–10 weeks. The project also required parallel work across several disciplines and the integration of new systems while maintaining operational reliability.

Odd Henrik Iversen, Yard Director at Vard Langsten, said the project matched the yard’s capabilities and allowed the team to use its multidisciplinary competence to deliver within a tight timeframe.

Built in 2018, Skandi Minder is a 95 m subsea vessel of Salt Ship Design 200 and can accommodate 52 persons.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
VARD’s NKT Eleonora has arrived at Vard Brattvaag for final outfitting and commissioning. The cable-laying vessel is scheduled for delivery in Q1/Q2 2027.
SLB and Equinor have signed a multi-year NCS stimulation agreement that includes a major upgrade of MV Island Captain for fully proppant-capable offshore operations.
DOF Group will sell four PSVs, generating about $50 million in net cash proceeds after related debt repayment, and acquire two 123 m newbuild CSVs for delivery in 2027 and 2028.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com