Search
Close this search box

Vår Energi Receives Havtil Consent for Balder Phase VI Start-up on the Norwegian Continental Shelf

Vår Energi has received Havtil consent to start up and operate Balder Phase VI on the Norwegian Continental Shelf. The project forms part of the Balder and Ringhorne development approved under the revised PDO.
Jotun FPSO (Image Credit: Vår Energi)

SHARE ARTICLE

Vår Energi has received consent from the Norwegian Ocean Industry Authority (Havtil) to start up and operate Balder Phase VI on the Norwegian Continental Shelf (NCS).

The Balder field is located in the central North Sea, west of the Grane field, in a water depth of 125 m. The field was discovered in 1967. Its original Plan for Development and Operation (PDO) was approved in 1996, and production began in 1999.

The development consists of subsea wells connected to the Balder FPSO for production, storage and offloading. The Balder complex also includes the Ringhorne deposit, which is located about 9 km north of the vessel.

Ringhorne is equipped with a combined accommodation, drilling and wellhead facility. It is tied back to the Balder and Jotun FPSOs for crude oil processing, storage and gas export.

A revised PDO covering Balder and Ringhorne was approved in June 2020. The development plan includes the relocation and lifetime extension of the Jotun FPSO together with the drilling of new subsea wells.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Equinor plans to route Grimsnes volumes through Stjerne to Oseberg Sør, with two or three wells under consideration and subsea equipment procurement planned before project sanction.
The transaction covers PL 169E, PL 956 and PL 956B and is expected to add 4.3 million boe net of combined 2P reserves and 2C resources, with the 2C volumes expected on stream in 2029.
DOF will deploy a construction support vessel in Q1 2027 to remove subsea infrastructure and clear the seabed across several offshore fields, with engineering and disposal also included in the contract.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com