Search
Close this search box

TWD Designs Monopile Deck Systems for Boreas

TWD has highlighted its work with Van Oord on Boreas, designing monopile deck systems that support transport, securing and installation of large offshore wind foundations.
Image source: TWD

SHARE ARTICLE

TWD has marked the first anniversary of Boreas by highlighting its role in designing monopile deck equipment for the offshore installation vessel.

The Dutch engineering company worked with Van Oord on the vessel’s monopile deck spread, which supports the transport, securing and installation of large monopile foundations for offshore wind projects.

The scope included a four-lane monopile seafastening system, an upend hinge system and a monopile gripper with integrated noise mitigation deployment technology.

The design was developed as offshore wind foundations continue to increase in size and weight. For installation vessels, that trend places more pressure on deck layout, cargo securing systems and operational flexibility.

According to TWD, the seafastening arrangement was engineered to handle a wide range of monopile diameters. This allows Boreas to support different project requirements without major equipment changes.

The engineering work also covered structural integration and load spreading. These elements help manage the forces created by heavy monopile cargoes and support safe handling during transport and installation.

The monopile handling equipment was also integrated with the vessel’s wind turbine generator deck spread. For offshore contractors, this can help reduce mobilisation time between project scopes and improve vessel use.

Boreas was developed for large offshore wind installation work and is part of the growing fleet of specialized vessels serving the renewable energy sector. Its first anniversary comes as offshore wind developers and contractors continue to expand capacity in Europe and other markets.

For TWD and Van Oord, the anniversary underlines a partnership focused on equipment design for larger and more complex offshore wind installation campaigns.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Dajin Heavy Industry has started production of 63 transition pieces for the 976.5 MW Gennaker offshore wind farm following first steel cutting at its Penglai manufacturing base.
North Star has secured GBP 275 million, approximately EUR 321 million, in debt financing to cover existing shipbuilding commitments and support the expansion of its offshore wind SOV fleet.
DEME has installed the first transition piece at Vattenfall’s 980 MW Nordlicht I offshore wind farm in the German North Sea, following the first monopile installation in early July.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com