
EnBW inaugurates 960 MW He Dreiht offshore wind farm in Germany
EnBW has inaugurated the 960 MW He Dreiht offshore wind farm in Germany after completion of all 64 Vestas V236-15.0 MW turbine installations.

EnBW has inaugurated the 960 MW He Dreiht offshore wind farm in Germany after completion of all 64 Vestas V236-15.0 MW turbine installations.

The UK MAIB has launched a full investigation into the collision between Cadeler’s Wind Orca and BG Orange at the Port of Tyne, which caused a crane collapse and damaged the container ship.

Cadeler has completed installation of 64 Vestas V236-15.0 MW turbines at the 960 MW He Dreiht Offshore Wind Farm in the German North Sea.

An investigation has begun after Cadeler’s Wind Orca collided with the berthed BG Orange at the Port of Tyne, where a gantry crane was damaged and one operator was injured.
For general inquiries and to contact us,
please email: info@hmt-news.com