Search
Close this search box

offshore wind

Google Signs 15-Year Offshore Wind PPA in Germany

Google has signed a 15-year PPA with EnBW covering 100 MW from Germany’s 960 MW He Dreiht offshore wind farm, which produced first power in November 2025 and is progressing toward full operation.

Mammoet Secures Seatrium Substation Load-Out Deal

Mammoet signed an agreement with Seatrium to load out three substations for TenneT’s 2GW HVDC offshore grid programme, using specialist skidding systems for topsides exceeding 30,000 tonnes.

KCI Joins Huisman MSTS Design Work

KCI Offshore Engineering was selected by Huisman to support engineering and design for the Monopile Storage & Transport System, covering system, basic, and detailed design phases.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com