Search
Close this search box

Saka Energi tenders jack-up for twin offshore blocks

Saka Energi, an indirect Pertamina subsidiary, is seeking a jack-up rig for a 12-month drilling campaign on its Pangkah and Pekawai offshore blocks and has opened prequalification to contractors.
Photo source: Shutterstock

SHARE ARTICLE

Indonesia’s Saka Energi, an indirect subsidiary of Pertamina, has launched a tender for a jack-up drilling unit to work on two domestic offshore blocks.

The company is preparing a 12-month drilling campaign that will cover wells on its Pangkah block off East Java and the Pekawai block in waters offshore East Kalimantan.

To execute this programme, the Indonesian operator is running a prequalification process for a contract package that will include the jack-up rig together with associated equipment, manpower and materials needed to support drilling on both blocks.

Saka Energi holds a 100% operated stake in the exploration block of Pekawai, located in the Kutei basin. The player also owns all equity in the Pangkah block, a more mature asset that hosts producing fields including the West Pangkah field and Sidayu.

Interested contractors are required to register electronically and obtain the prequalification documents by 15.00 local time / 08.00 GMT.

Back in 2018, Saka Energi secured two Indonesian blocks — West Yamdena, spanning onshore and offshore areas of Maluku, and Pekawai — after both blocks had been on offer in the prior year’s licensing round.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
PV Drilling will mobilize Borr Drilling’s IDUN jack-up rig for PVEP-HCM’s three-well TL-WHP program offshore Vietnam, with the 134-day campaign expected to start in mid-October 2026.
Arabian Drilling announces resumption of two offshore rigs in Saudi Arabia
Arabian Drilling has signed an Oman offshore contract with Masirah Oil and Northern Offshore for two firm wells and two optional wells, with work due to start before the end of Q3 2026.
Valaris 249 completed a two-well workover and completion campaign for BP offshore Trinidad nearly 17 days early. The rig is due for maintenance before starting work for Shell in October 2026.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com