Search
Close this search box

Petrovietnam Sets Out 2025 Mega-Project Milestones

Petrovietnam outlines 2025 milestones across Dai Hung Phase 3, Block B CPP Jacket fabrication, BK-24 & White Lion deliveries, and PTSC’s EPC award for 33 offshore wind jackets.
Photo: 𝐏𝐄𝐓𝐑𝐎𝐕𝐈𝐄𝐓𝐍𝐀𝐌

SHARE ARTICLE

Petrovietnam says 2025 marks a step forward in technological autonomy and delivery capability across large-scale oil & gas and energy projects, citing a series of milestones in Vietnam’s industrial and energy landscape.

For Dai Hung Phase 3, the group describes an end-to-end scope—design, fabrication, installation and operation—handled by Petrovietnam units, with first oil delivered ahead of schedule.

On the Block B CPP Jacket, PTSC M&C is reported to have fabricated over 13,000 tonnes of steel structure domestically to international standards, which Petrovietnam says reflects Vietnam’s rising offshore engineering capacity.

The group also points to the BK-24 and White Lion Complex, stating Vietsovpetro has reinforced its EPCI strength through multiple ahead-of-schedule deliveries, supporting stable output amid field decline.

In addition, Petrovietnam says PTSC has become the EPC contractor for 33 offshore wind jackets for the international market. It also notes onshore EPC progress through the PTSC–PETROCONs consortium via the Long Phu 1 Thermal Power Project.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Aibel will assign around 250 employees in Asker, supported from Haugesund, to the study, with completion expected in late 2027. An exclusive EPma option is included; fabrication will be awarded later.
COOEC has begun hull assembly for the Kaiping cylindrical FPSO in Qingdao. The 182-section hull will form the central production and storage facility for a major deepwater oilfield development in the South China Sea.
McDermott has shipped the 4,600-tonne Shell Manatee topsides from Altamira, Mexico, to Trinidad and Tobago. The structure will be installed offshore as part of the Manatee gas development.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com