Search
Close this search box

Huarun Dadong Secures Sparta Semisub Accommodation Retrofit

Huarun Dadong Dockyard will convert a sixth-generation semisubmersible rig into a 600-person accommodation unit under the Sparta retrofit project for deployment in Brazilian waters.
Illustration (Source: Shutterstock / ID-2704209309)

SHARE ARTICLE

Huarun Dadong Dockyard has secured a contract for the Sparta retrofit project, which will convert a semisubmersible drilling rig into a floating accommodation unit for 600 people.

The Shanghai-based yard signed the agreement with Hong Kong-based China Merchants Harbour Engineering. The rig is scheduled to arrive at Huarun Dadong Dockyard next week for a 14-month overhaul.

Built in 2010 by Jurong Shipyard in Singapore, the sixth-generation deepwater drilling rig is expected to complete the retrofit around the third quarter of 2027.

The unit is scheduled to deploy to Brazilian waters after completion. It will support offshore field development, maintenance and hookup work.

Financial terms and the identity of the Brazilian end-client were not disclosed. It is also unclear whether China Merchants Harbour Engineering will own the accommodation unit after the retrofit.

The conversion scope includes the installation of a new 500-berth accommodation module on the existing semisubmersible structure. The moonpool will also be sealed.

Ten new marine evacuation systems will be installed, while two cranes will be replaced. The work will also cover overhauls of the thrusters and the electrical and control systems.

A life-extension programme will add 25 years to the rig’s service life. The unit will be 42 years old when the extended operating period ends.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Karoon Energy reported 97.2% operating efficiency for the FPSO Cidade de Itajaí after maintenance and well restoration at the Baúna field. The company also completed the FPSO operatorship transfer during the quarter.
MODEC FPSO Gato do Mato forward hull leaving Japan for China integration
MODEC’s FPSO Gato do Mato forward hull has departed Japan for China, where it will be integrated with the aft hull section before the project moves to its next phase.
Karoon Energy has taken over operatorship of FPSO Cidade de Itajaí from Altera & Ocyan after completing regulatory approvals and transition work.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com