Search
Close this search box

HAREKET Moves 601 tonnes CO₂ Stripper to Habshan 5

HAREKET transported a 601 tonnes CO2 Stripper and four CO2 Absorbers about 130 km in Abu Dhabi for the PE 109 CRI Project – Habshan 5, using SPMTs and hydraulic trailers.
Photo source: HAREKET via LinkedIn

SHARE ARTICLE

HAREKET has safely transported one CO₂ Stripper and four CO₂ Absorbers for the PE 109 CRI Project – Habshan 5 in Abu Dhabi, UAE. The cargo moved from the ICAD private jetty to the Habshan 5 site over a distance of approximately 130 km.

The CO₂ Stripper measures 50.7 m in length, 10.5 m in width, and 10.6 m in height, weighing 601 tonnes (t). The transport operation used 64 axle lines of TII SCHEUERLE SPMTs and 60 axle lines of hydraulic trailers. During the move, the convoy travelled via the E11 highway and crossed the Etihad Rail line in the Tarif area under controlled conditions.

Photo source: HAREKET via LinkedIn

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
SMC completed the SPMT load-out and barge transport of a 2,000-tonnes pre-piling template for the Fengmiao 1 offshore wind project in Taiwan.
Mammoet completed the loadout of a 5,461 t offshore jacket foundation for BorWin6 in Jebel Ali, UAE, using 216 SPMT axle lines and quay mooring support.
Mammoet completed the overland relocation of twelve barges from the Pulau Tekong Polder stormwater pond, using airbags, winches and SPMTs to support Singapore’s first empoldering project.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com