Search
Close this search box

Fjord Carries Export Cables from Greece to Poland

The barge Fjord, towed by the oceangoing tug Eraclea, is carrying two export cables weighing more than 5,000 tonnes each from Greece to Poland for offshore installation works.
Image source: Manora Logistics via LinkedIn

SHARE ARTICLE

The barge Fjord, towed by the 120 tBP oceangoing tug Eraclea, is making steady progress from Greece to Poland with export cable cargo for an offshore wind project.

The shipment includes two main export cables, each weighing more than 5,000 tonnes, together with four spare cables. The cargo was loaded in Greece before the transport unit continued its voyage to Poland.

After arrival, the cables will be transferred from Fjord to a cable-laying vessel and installed offshore as part of the project works.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Partner Stocznia has contracted Vuyk Engineering to design a 3,000 m³ TSHD intended for maintenance work and support duties on dredging projects.
Boskalis vessel Windpiper has started rock installation at Bałtyk 2 and Bałtyk 3 after loading nearly 45,000 tonnes of rock in Norway for export cable protection.
Heerema Marine Contractors is setting up an engineering hub in Porto, Portugal, to support offshore wind, heavy lift, marine infrastructure and decommissioning projects.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com