Search
Close this search box

COSCO Shipping Transports Two GENMA Mobile Harbor Cranes to Indonesia

COSCO Shipping has transported two GENMA Mobile Harbor Cranes from the Taicang manufacturing base to Indonesia. The cranes feature electric and hydraulic combined systems and exceed 120 m/min in hoisting performance.
Image captured from a Facebook video posted by Genma.

SHARE ARTICLE

Two GENMA Mobile Harbor Cranes (MHC) were recently loaded aboard a COSCO Shipping vessel at the GENMA Taicang manufacturing base, commencing their voyage to Indonesia. The shipment involves equipment designed for bulk and general cargo handling at terminal operations.

The cranes belong to GENMA’s strategic MHC product line and incorporate a combined operating configuration. Frequency-conversion electric systems drive their hoisting, slewing, and traveling functions, while the luffing function operates through a hydraulic drive. This arrangement links the precision of electric control with the stable output characteristics of hydraulic machinery.

Under this setup, the cranes’ electric hoisting speed exceeds 120 m/min, marking a notable performance step for the model. Meanwhile, the hydraulic system—recognized for high power density, compact structure, and overload-protection capability—supports controlled and reliable luffing operations.

Once the equipment arrives at the Indonesian port, GENMA will perform on-site testing and operator training to ensure that the cranes meet their intended performance parameters. These activities aim to help the terminal improve operational efficiency and strengthen its competitiveness.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Ventura Offshore will manage Deep Value Driller and has signed an Indonesia drilling contract with PETRONAS carrying an estimated value of approximately $58 million.
Saipem has secured a $1.8 billion EPCI contract in the Middle East covering offshore and subsea facilities, with the client and project details undisclosed.
The first 1,000 t offshore jacket for bp’s Tangguh UCC Project has reached Fakfak after a 5,800 km voyage from Karimun Yard, clearing the way for offshore installation work.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com