Search
Close this search box

Offshore

Aker BP Starts Solveig Phase 2 Production

Aker BP has brought Solveig Phase 2 onstream after completing development drilling. New subsea production wells in the Norwegian Sea are tied back to existing host infrastructure on the NCS.

Hexicon Takes SEK 115m TwinHub Write-Down

Hexicon reports a net SEK 115 million impairment tied to the UK-based TwinHub project, including a SEK 127 million write-down partly offset by a SEK 12 million positive tax effect.

KCI Joins Huisman MSTS Design Work

KCI Offshore Engineering was selected by Huisman to support engineering and design for the Monopile Storage & Transport System, covering system, basic, and detailed design phases.

Zingst OSS Topside Rolls Out in Schiedam

HSI Joint Venture rolled out the 4,700 t OSS Zingst topside in Schiedam, progressing 50Hertz’s 927 MW OST-6-1 grid link for the Gennaker Offshore Wind Farm.

Seadrill Extends West Saturn Deal Offshore Brazil

Seadrill has secured a one-year extension for drillship West Saturn after Equinor Brasil Energia exercised a priced option. The deal adds $114 million to backlog and runs through October 2027.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com