Search
Close this search box

KANFA completes Karish Module M10 for Energean Power FPSO

KANFA has completed EPC work on Karish Module M10 at Drydocks World Dubai for the Energean Power FPSO. The module weighs under 700 tonnes and will increase liquid production capacity by 72%.
Photo: KANFA via LinkedIn

SHARE ARTICLE

KANFA has completed engineering, procurement and construction work on Karish Module M10 at Drydocks World Dubai for the Energean Power FPSO.

The oil and condensate separation module weighs under 700 tonnes and will increase the FPSO’s liquid production capacity by 72%.

For the M10 project, KANFA carried out project management, engineering, procurement, fabrication and pre-commissioning services.

The company also worked on topside process modules M1, M2 and M3 for the Energean Power FPSO from 2018 to 2020. KANFA said its previous work on the vessel, including experience with its design and layout, supported the execution of the M10 project.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
The PTSC LDV FSO started its 10-year firm charter on 20 September 2026, with options for up to five more years. Production at Lac Da Vang is expected to increase through 2028 as further wells enter service.
Petrobras' P-82 FPSO departed Singapore for Brazil's Búzios field on 18 October. The 225,000-bpd production unit is expected to begin operations in 2027 as the field's tenth platform.
COOEC has begun hull assembly for the Kaiping cylindrical FPSO in Qingdao. The 182-section hull will form the central production and storage facility for a major deepwater oilfield development in the South China Sea.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com