Search
Close this search box

Ocean Winner Sinks in Bay of Bengal, 22 Crew Missing

The 70,000 dwt bulker Ocean Winner sank in the Bay of Bengal after developing a list. Two crew members were rescued, while 22 remain missing as the search continues.
Image credit: Malcolm Milllar / Marine Traffic

SHARE ARTICLE

A search is continuing in the Bay of Bengal for 22 crew members from the bulker Ocean Winner, which sank after developing a list on Friday.

The 70,000 dwt Ocean Winner had loaded iron ore at Paradip, India, and departed for Singapore on 20 August with 24 crew members aboard. The 1998-built vessel, IMO 9145530, lost its AIS signal at 16:45 GMT on 21 August. A distress alert was transmitted at around the same time.

Two crew members reached a life raft and were later spotted by an Indian Navy patrol aircraft. Another vessel recovered both survivors on Saturday.

The survivors told search and rescue authorities that Ocean Winner began listing on Friday evening and sank in about eight minutes. The crew abandoned the vessel, but 22 people remain missing.

Three ships are taking part in the search, according to the Indian Navy and Coast Guard.

The cause of the sinking has not been established. The rapid loss of the vessel, the reported list before sinking and the iron ore cargo were described in the source as factors consistent with bulk liquefaction, but no cause has been confirmed.

Iron ore fines can present a liquefaction risk when wet. If the cargo shifts during rolling, vessel stability can deteriorate and the list can increase.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Hengli Heavy Industries received 207 vessel orders in the first half of 2026, with its backlog reaching about 380 ships through 2030 and production running at about seven ships per month.
Davie Shipbuilding has secured a C$11.3 billion fixed-price contract to build six Program Icebreakers for the Canadian Coast Guard under Canada’s National Shipbuilding Strategy.
Equinor and its partners started Troll Phase 3 stage 2 production ahead of schedule, accelerating 55 billion standard cubic metres of gas from the Troll West reservoir.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com