Search
Close this search box

Odfjell Drilling Extends Deepsea Nordkapp Contract with Aker BP to End-2028

Odfjell Drilling has secured a one-year Aker BP extension for Deepsea Nordkapp, extending the semi-submersible rig’s firm contract period through the end of 2028.
Deepsea Nordkapp (Image credit: Odfjell Drilling)

SHARE ARTICLE

Odfjell Drilling has received signed confirmation from Aker BP for a one-year extension covering the Deepsea Nordkapp, extending the semi-submersible rig’s firm contract period through the end of 2028.

Aker BP will retain further options after the firm period expires. The operating rate for the additional year will be fixed by the end of 2026. Two independent rig brokers will determine a rate reflecting market conditions at that time.

The Deepsea Nordkapp has operated continuously for Aker BP since the rig was delivered in 2019. The latest extension continues the companies’ existing Semi Alliance arrangement.

The Deepsea Nordkapp is a sixth-generation, dynamically positioned and winterised harsh-environment semi-submersible built to the Moss enhanced CS 60E design. It can operate in water depths of up to 2,000 m and drill to a depth of 10,670 m. The rig has accommodation for 150 people and is fitted with a hybrid energy storage system, according to Odfjell Drilling.

During the first quarter of 2025, the rig underwent planned maintenance that resulted in six off-hire days. The work included upgrades and the replacement of two thrusters, according to the company’s second-quarter 2025 results presentation.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Expro has completed its NOK 2 billion acquisition of Enhanced Drilling, adding managed pressure drilling, controlled mud level drilling and riserless mud recovery capabilities.
Equinor and its partners found 7.6-10.5 million barrels of recoverable oil equivalent at Skrugard North Tubåen, with a possible tie-back to the Johan Castberg field.
Velesto has secured a $51 million i-RDC contract to deploy the Naga 8 jack-up rig for the North Malay Basin campaign from August 2026 through 2028.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com