Search
Close this search box

RWE, TotalEnergies Charter Purus Power for OranjeWind

RWE and TotalEnergies’ OranjeWind venture has signed a five-year charter with Purus for Purus Power to support O&M work at the Dutch offshore wind farm.
Purus Power (Photo source: OranjeWind)

SHARE ARTICLE

OranjeWind, the joint venture between RWE and TotalEnergies, has signed a five-year charter agreement with Purus for the CSOV Purus Power.

The vessel will support planned and unplanned operations and maintenance work at the OranjeWind offshore wind farm in the Netherlands. The contract also includes an extension option.

Purus Power measures 88 m in length and 19 m in width. The vessel was built for offshore wind operations and is equipped with diesel-electric and battery-hybrid propulsion. It is also prepared for future upgrades, including possible conversion to zero-emission energy sources.

The CSOV has an integrated walk-to-work system and is designed for extended offshore deployment. Onboard facilities include accommodation, office space, meeting rooms, a gym and a mess area for personnel.

The 795 MW OranjeWind offshore wind farm, also known as Hollandse Kust West VII, is located about 53 km off the Dutch coast. Construction has already started.

The project will feature 53 Vestas V236-15 MW turbines on monopile foundations produced by Sif. Inter-array cables will be supplied by TKF. Jan De Nul will install the foundations and turbines, while DEME will carry out the inter-array cable installation.

OranjeWind is scheduled to start operations in 2028.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Pioneering Spirit used its jacket lift system to install both suction bucket foundations and topsides in shallow water for 50Hertz’s OST-6-1 connection, completing the work in one offshore campaign.
Dogger Bank A has secured an eight-month extension to the CfD start date for its first 300 MW contract tranche. The revised July 2027 deadline follows turbine blade failures and additional repair requirements.
Sven Utermöhlen brings 20 years of offshore wind experience to Esvagt. RWE’s succession announcement also provided for him to advise its offshore wind business for six to twelve months after his departure.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com