Search
Close this search box

Saipem Sends BGUP Module to Libya’s Bouri Field

Saipem has shipped the Bouri Gas Recovery Module from Italy to Libya for deployment at the offshore Bouri field under the BGUP development.
Image source: Rosetti Marino Group of Companies via LinkedIn

SHARE ARTICLE

Saipem has completed and shipped the Bouri Gas Recovery Module from the Rosetti Marino Group of Companies yard in Marina di Ravenna, Italy, for deployment at Libya’s offshore Bouri field.

The module is being transported to the Bouri offshore area, about 170 km off the Libyan coast, where it will operate as part of the Bouri Gas Utilization Project (BGUP).

Saipem is the main contractor for the project, covering engineering work, execution phase integration and offshore installation. The development is intended to support energy efficiency improvement and emissions reduction at one of the Mediterranean region’s major offshore production assets.

The topside upgrade and subsea system were awarded by Mellitah Oil and Gas B.V., the joint venture between Eni and Libya’s National Oil Corporation (NOC). The project is designed to recover and make use of associated gas from the Bouri offshore oil field.

The recovered gas will be treated, compressed and transported to the Mellitah complex. According to Saipem, this will support CO2 emissions reduction and improve the overall efficiency of the production system.

The Bouri Gas Utilization Project is expected to handle around 3 million m³ of gas per day. It is also expected to increase gas production, make better use of existing infrastructure and contribute to energy security.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Technip Energies, JGC and Samsung Heavy Industries have secured an EPCIC contract for the Coral North FLNG project offshore Mozambique.
Saipem 7000 has installed a gas recovery module weighing more than 5,200 tonnes for the Bouri Gas Utilization Project offshore Libya.
Saipem has installed a gas recovery module weighing more than 5,200 tonnes for Libya’s Bouri Gas Utilization Project using the heavy-lift vessel Saipem 7000.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com