Search
Close this search box

LMC Wins PNG FSO Turret Contract

LMC has won a contract from MISC to supply the external turret mooring system for Papua New Guinea’s planned first offshore floating facility.
Image source: London Marine Consultants

SHARE ARTICLE

London Marine Consultants (LMC) has secured a contract from MISC to supply an external turret mooring system for a planned floating storage and offloading vessel in Papua New Guinea.

The FSO was recently awarded to MISC by ExxonMobil, with support from Santos. The vessel will have a storage capacity of about 800,000 barrels and is expected to receive oil from Santos-operated fields connected to the Kutubu Pipeline System in the first half of 2028.

The turret mooring system will help keep the FSO on station and provide a route for oil production to move through the offshore facility. Such systems are large steel structures used on FSOs and floating production, storage and offloading vessels.

London Marine Consultants (LMC), owned by Yinson Production, will carry out the design work at its London headquarters. Fabrication will take place in Southeast Asia.

The award is the company’s 16th turret mooring contract. It follows its 2025 award for the turret system on the Vietnam Block B FSO, which is under construction in Vung Tau.

The Papua New Guinea FSO is planned as the country’s first offshore floating facility. London Marine Consultants (LMC) works in a specialist market that also includes SOFEC, Bluewater, and National Oilwell Varco (NOV)’s APL division.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
The PTSC LDV FSO started its 10-year firm charter on 20 September 2026, with options for up to five more years. Production at Lac Da Vang is expected to increase through 2028 as further wells enter service.
Aibel will assign around 250 employees in Asker, supported from Haugesund, to the study, with completion expected in late 2027. An exclusive EPma option is included; fabrication will be awarded later.
COOEC has begun hull assembly for the Kaiping cylindrical FPSO in Qingdao. The 182-section hull will form the central production and storage facility for a major deepwater oilfield development in the South China Sea.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com