Search
Close this search box

Haskoning Secures ELWIND Offshore Wind Design Mandate

Haskoning signs a three-year contract with Latvia’s investment agency to deliver the ELWIND design phase, producing integrated technical designs for two Baltic Sea offshore wind farms.
Photo source: Haskoning

SHARE ARTICLE

Haskoning has signed a contract with the Investment and Development Agency of Latvia to deliver the design phase for the ELWIND offshore wind project over the next three years.

ELWIND is a joint, state-run Estonian and Latvian offshore wind initiative aimed at increasing regional independence by expanding renewable energy production. Haskoning will prepare the general concept for two wind farms planned in the Baltic Sea and develop it into an integrated, comprehensive technical design for the ELWIND project.

The scope of work includes layout optimization, transmission grid studies, and integrating inputs from site investigations and environmental assessment. The design output is intended to inform decision-making and support preparation for subsequent development phases.

Haskoning will execute the project with subconsultant partner Empire Engineering, which will design the wind turbine foundations.

The assignment follows Haskoning’s involvement in earlier ELWIND development activities, including a cable study. Drawing on offshore wind experience from the North Sea, Haskoning is supporting offshore wind development in the Baltic region through technical design work aligned with the project’s stated objectives.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
RWE and TotalEnergies’ OranjeWind venture has signed a five-year charter with Purus for Purus Power to support O&M work at the Dutch offshore wind farm.
COSCO Shipping Specialized Carriers has completed the transport and float-over installation of the offshore converter platform for the Qingzhou V & VII offshore wind project in China.
A Massachusetts judge has denied GE Vernova’s appeal in the Vineyard Wind case, keeping a preliminary injunction in place for the Vineyard Wind 1 offshore wind project.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com